This major regeneration project kickstarted the regeneration of the St Vincent’s Quarter in Sheffield.
In 1818 Mr Stephenson and Mr Blake formed a business that continues today as Stephenson Blake. The company became one of the largest and the most famous type foundry in the world.
The property comprised over one and a half acres of land in single ownership and containing a number of buildings including a remarkable range of Victorian industrial buildings designed to carry the extreme weights necessitated by the lead casting processes. A private road ran through the centre of the site which originally served another range of buildings that had been demolished due to increasing business rates and the shrinking of the business needs over the years.
Initial approaches to the Local Authority were disappointing as they believed that the district should remain solely for commercial and industrial use in spite of the many empty and derelict properties. This attitude was reinforced by the Unitary Development Plan, and the planners believed that the poor quality of the building stock was advantageous and actually made it attractive to start up and marginal businesses.
Despite the authority’s initial views, there was a growing body of anecdotal evidence that businesses were moving out of the area because it was unsuitable for modern business needs due to the steep topography, narrow streets, unsuitable buildings and growing social problems connected with street prostitution and drug abuse.
Studies were undertaken with a wide variety of stakeholders, including businesses, property owners, residents, potential investors, the universities, police and social services. These pointed to the planners stance and the UDP being out of date and unsustainable and with this in mind a purchase was agreed with Stephenson Blake.
Over the following year further studies and consultations were carried out and a scheme devised that was 100% residential which included the restoration of the existing high quality buildings, along with carefully identified demolition and site clearance to permit new build construction on the brownfield site. Liaison with local police commanders showed that there was an appetite to deal with local social issues and that new residents coming into the area would provide a welcome catalyst to would inject new life into the area and assist in displacing street prostitution and drug use.
After a number of iterations the final scheme was devised in three main phases to be called Original Impact, Minor Impact and Major Impact.
Why Impact? The project title is more than a dreamed up marketing name. Impact was chosen because it is one of the famous fonts owned by the Stephenson Blake type foundry and this famous font can be found on every PC. Impact at Wikipedia
Original Impact comprises the existing brick built type foundry fronting Upper Allen Street converted into 36 private loft style apartments that highlighted the many remaining original features.
Minor Impact is new build student accommodation of 50 apartments comprising 254 cluster bedrooms over nine storeys. Each room is fully en-suite and part of a cluster unit of average five beds.
Major Impact was planned as an eight storey private apartment building with 116 units. The unusual design creates an internal street below a full width extending eight floors to a soaring glass roof above. Apartments accessed by a network of bridges spanning across the atrium, giving dual aspect to each residence and creating a unique interior space.
Hidden Impact is the vital 93 space multi-storey car park beneath Major Impact and the landscaped courtyard.
Because of the regeneration value there was zero social housing provision was negotiated with the local authority.
36 Heritage Conversion Apartments
254 PBSA Student Beds in 50 apartments
116 New Build Apartments
93 Space Underground Car Park